Day 551 - Oversight and 1.3 km drawing.
Day 550 - Rurban and 4.3 km drawing.
Day 549 - Roll and 2.9 km drawing.
Day 548 - Closure and 2.4 km drawing.
Fuji-san and 3.4 km drawing.
Day 547 - Railroad and 2.4 km drawing.
Day 546 - Regeneration and 3.0 km drawing.
Day 545 - Community and 4.5 km drawing.
Day 544 - Marshalling and .5 km drawing.
Mislocate and 6.2 km drawing.