Monday 30 June 2014

The Coulee / Jensen Reservoir

Urban and 6.7 km drawing with rural and 4.2 km drawing.

Sunday 29 June 2014

Stewart Siding

Lightning, thunder, hail, rain and 10.8 km drawing.

Saturday 28 June 2014

Fairview

Close to the edge and 4.1 km drawing.

Friday 27 June 2014

Nobleford

Animal life and 9.8 km drawing.

Thursday 26 June 2014

Wednesday 25 June 2014

Tuesday 24 June 2014

Six Mile Coulee

Fresh slumpage and 4.2 km drawing.

Monday 23 June 2014

McNab

Lineage and 5.9 km drawing.

Sunday 22 June 2014

Helena / Teton / Nobleford / Ravine Park


Helena and .420 km drawing, Teton and .367 km drawing, Nobleford and .529 km drawing, Ravine Park and 2.8 km drawing

Saturday 21 June 2014

Perry / Butte

Surveillance and 1.4 km drawing with Control and 3.1 km drawing

Friday 20 June 2014

North Rim / Cedar City

The wilds and 1.7 km drawing with the civilized and 4.5 km drawing.

Thursday 19 June 2014

North Kaibab

The semi-depths and 15.4 km drawing.

Wednesday 18 June 2014

Point Imperial / Cape Royal

Viewing and .564 km drawing with engagement and 2.1 km drawing.

Tuesday 17 June 2014

North Rim

Vertigo and 6.0 km drawing.

Monday 16 June 2014

Angels Landing / Virgin River

Angels Landing and 8.9 km drawing with Virgin River and 3.6 km drawing

Sunday 15 June 2014

Kodachrome / Bryce Canyon

Geology and 3.4 km drawing with more geology and 13.1 km drawing.

Saturday 14 June 2014

Willard / Gunnison / Kodachrome

Natural Life with Willard and 1.9 km drawing, Gunnison and 1.2 km drawing, 
Kodachrome and 1.9 km drawing.

Friday 13 June 2014

Willard

Time-lag and 1.9 km drawing.

Thursday 12 June 2014

Piyami Coulee

Green and 3.5 km drawing.

Wednesday 11 June 2014

Cardston County

Investigating and 7.3 km drawing.

Tuesday 10 June 2014

Lethbridge County

Normal and 4.6 km drawing.

Monday 9 June 2014

Pavan

Thunderheads and 6.3 km drawing.

Sunday 8 June 2014

Saturday 7 June 2014

Pothole Creek

Summer-wear and 7.6 km drawing.

Friday 6 June 2014

Hardieville

Sadly with 7.5 km drawing.

Thursday 5 June 2014

Oldman River Coulee

Preparing for the flood and 4.7 km drawing.

Wednesday 4 June 2014

North Lethbridge / Nobleford

Deaccessioning  with 4.9 km drawing and collections with 8.1 km drawing.

Tuesday 3 June 2014

Picture Butte

Flattish and 8.4 km drawing.

Monday 2 June 2014

Pothole Creek

Threatening and 3.3 km drawing.

Sunday 1 June 2014

South / North Lethbridge

Getting down with .598 km and 1.4 km drawings.