Thursday 31 December 2015

Botterill Bottom

Following the signs and 3.0 km drawing.

Wednesday 30 December 2015

Tuesday 29 December 2015

Tecumseh

Recreate and 5.2 km drawing.

Monday 28 December 2015

Tecumseh

Slog and 4.4 km drawing.

Sunday 27 December 2015

Crowsnest Mountain

Cabins and 1.4 km drawing.

Saturday 26 December 2015

Friday 25 December 2015

Mountain View

Respite and 3.2 km drawing.

Thursday 24 December 2015

Agnes


Early discard and 2.9 km drawing.

Wednesday 23 December 2015

Bridge

Coal and 3.1 km drawing.

Tuesday 22 December 2015

Kings

Rotation and 1.7 km drawing.

Monday 21 December 2015

Popson

Rhythm section and 2.5 km drawing.

Sunday 20 December 2015

Aperture Lake

Remains and 4.8 km drawing.

Saturday 19 December 2015

The Point

 
Ostracism and 2.6 km drawing.

Friday 18 December 2015

Bow River

Resurrection and loss with 2.9 km drawing.

Thursday 17 December 2015

Sue Higgins / St. George's Island

Observation and 1.7 km drawing with flashback and 3.2 km drawing.

Wednesday 16 December 2015

Coalbanks / The Crossings

Dusting and 2.9 km drawing with divide and 1.0 km drawing.

Tuesday 15 December 2015

Whoop-Up

Fresh air and 5.1 km drawing.

Monday 14 December 2015

Medicine Stone

Bridge and 3.9 km drawing.

Sunday 13 December 2015

Ottawa / Nobleford

Return and 1.1 km drawing.

Saturday 12 December 2015

Ottawa

Beuys, Raad, Ristelhueber and 7.5 km drawing.

Friday 11 December 2015

Ottawa

Parole and 8.4 km drawing.

Thursday 10 December 2015

Ottawa

Misdirected and 18.7 km drawing.

Wednesday 9 December 2015

Tuesday 8 December 2015

Mi'k(i)atowa's

Deserted and 5.6 km drawing.

Monday 7 December 2015

Ravine

Casual and 2.3 km drawing.

Sunday 6 December 2015

Botterill Bottom

Warming and 5.1 km drawing.

Saturday 5 December 2015

Mountain View

Bundled and 4.5 km drawing.

Friday 4 December 2015

Thursday 3 December 2015

Aperture

Graphic and 4.6 km drawing.

Wednesday 2 December 2015

Bull Trail

Deflected and 6.2 km drawing.

Tuesday 1 December 2015

Coalbanks / Ravine

Work and 3.1 km drawing with work and 4.2 km drawing.