Day 1062 - Precipitate and 1.6 km drawing.
Community and 3.6 km drawing.
Day 1061 - Exclusion Zones and 3.8 km drawing
Day 1060 - Ratiocination and 2.8 km drawing.
Day 1059 - Local and 1.7 km drawing.
Day 1058 - Siphon and 2.3 km drawing.
Day 1057 - Erasure and 3.2 km drawing.
Day 1056 - Revised and 3.1 km drawing.