Day 395 - Alienation and 2.7 km drawing.
Day 394 - Pan and 2.2 km drawing.
Day 393 - Ware and 1.5 km drawing.
Day 392 - Re-Convene and 2.0 km drawing.
Day 391 - Circuitous and .72 km drawing.
Elevate and 3.2 km drawing.
Day 390 - Battle and 11.9 km drawing.