Day 486 - Exhaust and 2.7 km drawing.
Day 485 - Stage 4 and 5.2 km drawing.
Day 484 - Stage 1 and 2.7 km drawing.
Stage 2 and 2.4 km drawing.
Stage 3 and 2.9 km drawing.
Day 483 - Riches and 9.1 km drawing.
Day 482 - Enshrined and 16.7 km drawing.
Day 481 - Automate and 10.6 km drawing.