Day 256 - Disturbance and 1.6 km drawing.
Day 255 - Expansion and 3.0 km drawing.
Day 254 - Cultured and 2.9 km drawing.
Celebration and 1.2 km drawing.
Day 253 - Agrarian and 2.1 km drawing
Post and 3.9 km drawing.
Day 252 - Residential and 3.2 km drawing.
Separate and 2.8 km drawing.
Day 251 - Playdate and 3.4 km drawing.