Day 858 - Education and 2.6 km drawing.
Day 857 - Descent and 5.4 km drawing.
Day 856 - Woodland and 3.5 km drawing.
Informal Architecture and 4.7 km drawing.
Day 855 - Expedition and 2.2km drawing.
Capitalism and 4.7 km drawing.
Compound and .62 km drawing
Day 854 - Transition and 1.5 km drawing.
Day 853 - The KEY and 3.0 km drawing.
Day 852 - PetroFossil and 5.2 km drawing.