Day 295 - Riptide and 1.6 km drawing.
Trenching and 3.0 km drawing.
Day 294 - Remainders and 2.5 km drawing.
Day 293 - Interregnum and 1.3 km drawing.
Day 292 - Proximity and 1.3 km drawing.
Day 323 - Organizing and 1.8 km drawing.
Day 291 - Altered and 3.3 km drawing.
Day 290 - Spring and 5.1 km drawing.
Day 289 - Drama and 1.6 km drawing.