Showing posts with label Average. Show all posts
Showing posts with label Average. Show all posts

Thursday, 27 December 2018

Chinook Arch / Botterill Bottom

 
Geological and 1.0 km drawing.

Capital and 3.7 km drawing.

Wednesday, 28 November 2018

Stadium / Stone Pipe

Duty and 3.8 km drawing.

Pleasure and 2.2 km drawing.