Showing posts with label Ground level. Show all posts
Showing posts with label Ground level. Show all posts

Saturday, 16 November 2019

Evangelical / Galt - The Point

Earthy and 3.6 km drawing.

Trajectory and 2.9 km drawing.

Sunday, 12 November 2017

Whitefish / Chinook

Modern and 1.0 km drawing.

Post and 4.5 km drawing.