Showing posts with label Recovery. Show all posts
Showing posts with label Recovery. Show all posts

Monday, 17 August 2026

Saturday, 25 July 2026

Day 190 - Juan Peron / Pincher Creek

 Day 190 - Waiting and .77 km drawing.

 

 

 Recovery and 0.45 km drawing.

Friday, 11 November 2022

Day 947 - Coulee

Day 947 - Reintroduce and 1.2 km drawing.

Saturday, 28 September 2013

Lethbridge

The news and 5.5 km drawing.