Showing posts with label Transitory. Show all posts
Showing posts with label Transitory. Show all posts

Tuesday, 18 November 2025

Day 503 - Canal

Day 503 - Crepuscular and 2.5 km drawing.

Tuesday, 27 December 2022

Day 993 - Southgate / Stone Pipe

Day 993 - Replenish and 1.0 km drawing.


Dusking and 2.6 km drawing.

Sunday, 24 March 2019

High Level

Flout and 4.6 km drawing.

Tuesday, 25 September 2018

The Grove

Development and 5.6 km drawing.

Saturday, 27 January 2018

Martha / Aperture

 Slide and 2.0 km drawing.

Flick and 1.3 km drawing.