Showing posts with label Underneath. Show all posts
Showing posts with label Underneath. Show all posts

Thursday, 2 July 2026

Day 167 - Worksite 1 / Chinook

Day 167 - Reveal and 2.9 km drawing.

 

Day 167 - Politic and 1.6 km drawing.

Wednesday, 18 March 2026

Day 61 - Scenic Heights Park

Day 61 - Transport and 2.7 km drawing.

 

Reveal and 1.7 km drawing.

Monday, 7 July 2025

Day 371 - Worksite 1 - Front / Worksite 1 - Back, Scenic

Day 371 - Exterior Design and 4.0 km drawing.

 

 Reveal and 3.6 km drawing.

Friday, 30 July 2021

Monday, 30 December 2019